دانلود مقاله ISI انگلیسی شماره 41319
عنوان فارسی مقاله

تجزیه و تحلیل استراتژیک از تعارض برق آبی بزرگ کانادا

کد مقاله سال انتشار مقاله انگلیسی ترجمه فارسی تعداد کلمات
41319 2014 9 صفحه PDF سفارش دهید محاسبه نشده
خرید مقاله
پس از پرداخت، فوراً می توانید مقاله را دانلود فرمایید.
عنوان انگلیسی
Strategic analysis of the Great Canadian Hydroelectric Power Conflict
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Energy Strategy Reviews, Volume 4, August 2014, Pages 43–51

کلمات کلیدی
برق آبی - انرژی - جنگ - مذاکرات - تجزیه و تحلیل تعادل - مدل گراف برای حل تعارض
پیش نمایش مقاله
پیش نمایش مقاله تجزیه و تحلیل استراتژیک از تعارض برق آبی بزرگ کانادا

چکیده انگلیسی

The contract negotiation that led to the 1969 agreement between Newfoundland and Labrador, and Quebec, is systemically analyzed within the framework of Graph Model for Conflict Resolution. The Great Canadian Hydroelectric Power Conflict has been ongoing since 1963 and shows no signs of ending. In this dispute, the Province of Quebec has the right to buy almost all of the power generated from the Upper Churchill Falls, which is located in the Labrador territory in Newfoundland and Labrador, at a very low price. Originally, the contract was signed by Churchill Falls Labrador Corporation to secure finances for the Upper Churchill Falls development. The unpopularity of the contract led to several unsuccessful attempts by the Newfoundland and Labrador Government to escape its provisions. Newfoundland and Labrador is currently negotiating to develop the Lower Churchill Project and seeking to avoid the mistakes of the first contract. Furthermore, the automatic renewal clause of the original contract is expected to cause another round of conflict in 2016. The analysis shows that, given the circumstances in which the agreement was signed, the outcome was almost inevitable. A third party intervener rule could have remediated the damage caused by the conflict.

خرید مقاله
پس از پرداخت، فوراً می توانید مقاله را دانلود فرمایید.