دانلود مقاله ISI انگلیسی شماره 93691
کد مقاله سال انتشار مقاله انگلیسی ترجمه فارسی تعداد کلمات
93691 2018 11 صفحه PDF سفارش دهید 10205 کلمه
خرید مقاله
پس از پرداخت، فوراً می توانید مقاله را دانلود فرمایید.
عنوان انگلیسی
Designing out construction waste using BIM technology: Stakeholders' expectations for industry deployment
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Journal of Cleaner Production, Volume 180, 10 April 2018, Pages 375-385

پیش نمایش مقاله
پیش نمایش مقاله

چکیده انگلیسی

The need to use Building Information Modelling (BIM) for Construction and Demolition Waste (CDW) minimisation is well documented but most of the existing CDW management tools still lack BIM functionality. This study therefore assesses the expectations of stakeholders on how BIM could be employed for CDW management. After a review of extant literature to assess the limitations of existing CDW management tools, qualitative Focus Group Interviews (FGIs) were conducted with professionals who are familiar with the use of BIM to understand their expectations on the use of BIM for CDW management. The 22 factors identified from the qualitative data analyses were then developed into a questionnaire survey. The exploratory factor analysis of the responses reveals five major groups of BIM expectations for CDW management, which are: (i) BIM-based collaboration for waste management, (ii) waste-driven design process and solutions, (iii) waste analysis throughout building lifecycle, (iv) innovative technologies for waste intelligence and analytics, and (v) improved documentation for waste management. Considering these groups of factors is key to meeting the needs of the stakeholders regarding the use of BIM for CDW management. These groups of factors are important considerations for the implementation and acceptance of BIM-based tools and practices for CDW management within the construction industry.

خرید مقاله
پس از پرداخت، فوراً می توانید مقاله را دانلود فرمایید.