دانلود مقاله ISI انگلیسی شماره 42274
ترجمه فارسی عنوان مقاله

یک مدل تصمیم های سرمایه گذاری برای قرار دادن بهینه واحد های اندازه گیری فازور

عنوان انگلیسی
An investment decision model for the optimal placement of phasor measurement units
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
42274 2015 9 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Expert Systems with Applications, Volume 42, Issue 21, 30 November 2015, Pages 7276–7284

ترجمه کلمات کلیدی
واحد اندازه گیری فازور - مکان بهینه - رویت شبکه - الگوریتم ژنتیک
کلمات کلیدی انگلیسی
Phasor measurement unit; Optimal placement; Network observability; Genetic algorithm
پیش نمایش مقاله
پیش نمایش مقاله  یک مدل تصمیم های سرمایه گذاری برای قرار دادن بهینه واحد های اندازه گیری فازور

چکیده انگلیسی

Safe operation and reliability of the electrical power systems necessitate full observability of the power grid. Phasor measurement units (PMUs) are the state-of-the-art intelligent devices that collect synchronized phasors of voltages and currents in real time. It is not economically justifiable to install PMUs at all buses of the power grid. Hence, designing the PMUs network and determining their optimal placement in the power grid is an investment decision. In this paper, we propose a new investment decision model to determine the optimal placement of PMUs that guarantees the full observability of the power grid. Network observability rules are applied to reduce the capital cost of installing PMUs. A problem-specific genetic algorithm is developed to determine the optimal investment decision. The N-1N-1 reliability requirement of the power grid has been integrated in the model as well to obtain the resilient network design against all single contingencies such as failure of a PMU or a transmission line. Furthermore, a two-phase investment plan is proposed, which provides the power system investors with more flexibility and avoids unnecessary investment costs. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUs will be installed in the second phase to guarantee the full observability in case of single contingencies. To test the efficacy of the proposed model, experiments are conducted on multiple IEEE test systems with and without considering zero-injection buses. The results are compared to the other methods such as integer linear programming and heuristic methods. The analysis shows that the proposed approach is promising and verifies its efficacy.