دانلود مقاله ISI انگلیسی شماره 43270
ترجمه فارسی عنوان مقاله

الگوریتم های یک کلونی زنبور مصنوعی دو مرحله ای با برنامه ریزی مشکل تولید کارگاهی انعطاف پذیر با قرار دادن کار جدید

عنوان انگلیسی
A two-stage artificial bee colony algorithm scheduling flexible job-shop scheduling problem with new job insertion
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
43270 2015 12 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Expert Systems with Applications, Volume 42, Issue 21, 30 November 2015, Pages 7652–7663

ترجمه کلمات کلیدی
برنامه ریزی تولید کارگاهی انعطاف پذیر - قرار دادن کار جدید - کلنی زنبور عسل مصنوعی - برنامه ریزی مجدد
کلمات کلیدی انگلیسی
Flexible job-shop scheduling; New job inserting; Artificial bee colony; Re-scheduling
پیش نمایش مقاله
پیش نمایش مقاله  الگوریتم های یک کلونی زنبور مصنوعی دو مرحله ای با برنامه ریزی مشکل تولید کارگاهی انعطاف پذیر با قرار دادن کار جدید

چکیده انگلیسی

This study addresses the scheduling problem in remanufacturing engineering. The purpose of this paper is to model effectively to solve remanufacturing scheduling problem. The problem is modeled as flexible job-shop scheduling problem (FJSP) and is divided into two stages: scheduling and re-scheduling when new job arrives. The uncertainty in timing of returns in remanufacturing is modeled as new job inserting constraint in FJSP. A two-stage artificial bee colony (TABC) algorithm is proposed for scheduling and re-scheduling with new job(s) inserting. The objective is to minimize makespan (maximum complete time). A new rule is proposed to initialize bee colony population. An ensemble local search is proposed to improve algorithm performance. Three re-scheduling strategies are proposed and compared. Extensive computational experiments are carried out using fifteen well-known benchmark instances with eight instances from remanufacturing. For scheduling performance, TABC is compared to five existing algorithms. For re-scheduling performance, TABC is compared to six simple heuristics and proposed hybrid heuristics. The results and comparisons show that TABC is effective in both scheduling stage and rescheduling stage.