دانلود مقاله ISI انگلیسی شماره 50308
ترجمه فارسی عنوان مقاله

مدیریت زنجیره تامین تعاونی بر اساس اطلاعات نامتقارن

عنوان انگلیسی
Cooperative Supply Chain Management Under Asymmetric Information
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
50308 2014 10 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Journal of Applied Research and Technology, Volume 12, Issue 2, April 2014, Pages 182–191

ترجمه کلمات کلیدی
اطلاعات نامتقارن - زنجیره تامین تعاونی - مدیر نماینده - انگیزه
کلمات کلیدی انگلیسی
Asymmetric information; cooperative supply chain; Principal-Agent; incentive
پیش نمایش مقاله
پیش نمایش مقاله  مدیریت زنجیره تامین تعاونی بر اساس اطلاعات نامتقارن

چکیده انگلیسی

This study investigates supply chain cooperative management problem. In this study, based on principal-agent, firstly we analyses cooperative management factors in supply chain including leading enterprise expected utilities, subsidiary enterprise expected incomes and leading enterprise agency cost, then the incentive contract model is constructed; Secondly the model is solved in the case of symmetric information and asymmetric information; At last, in order to make clear of the model, this paper does mathematical analysis of leading enterprise expected utilities, subsidiary enterprise expected incomes and leading enterprise agency cost. Some important conclusions are obtained: subsidiary enterprise ability, cost coefficient, absolute risk aversion factor and output variance has the same influence on leading enterprise expected utilities and subsidiary enterprise expected incomes; subsidiary enterprise ability, cost coefficient has the same influence on leading enterprise expected utilities, subsidiary enterprise expected incomes and leading enterprise agency cost; leading enterprise expected utilities and subsidiary enterprise expected incomes become bigger and bigger, but leading enterprise agency cost becomes smaller and smaller with absolute risk aversion factor and output variance decreased. etc. Leading enterprise can take on incentive measures (improving subsidiary enterprise ability, decreasing subsidiary enterprise cost coefficient.etc) to optimize supply chain management based on the common factors.