جستجو برای شدت جریان بهینه آب خنک کننده کندانسور در یک نیروگاه حرارتی

عنوان انگلیسی
The search for optimum condenser cooling water flow rate in a thermal power plant
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
53357 2011 8 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Applied Thermal Engineering, Volume 31, Issues 17–18, December 2011, Pages 4083–4090

ترجمه کلمات کلیدی
خنک کننده میزان جریان آب - سطح انتقال حرارت؛ نیروگاه حرارتی؛ بازیابی حرارت؛ بازده سیکل؛ شبکه مبدل های حرارتی
کلمات کلیدی انگلیسی
Cooling water flowrate; Heat transfer area; Thermal power plant; Heat recovery; Cycle efficiency; Heat exchanger network
پیش نمایش مقاله
پیش نمایش مقاله  جستجو برای شدت جریان بهینه آب خنک کننده کندانسور در یک نیروگاه حرارتی

چکیده انگلیسی

Heat losses from the thermal power plant cycle are due mainly to heat rejection through the condenser. Operating the condenser at optimum circulation water flowrate is essentially important to ensure maximum efficiency and minimum operating cost of the plant. In this study, computer program codes were developed in Microsoft Excel macros for simulation of a thermal plant at various circulation water flowrate, to determine the optimum condenser cooling water flowrate for the process. The study revealed that operating the condenser at reduced cooling water flow rate of 32,000 m3/h instead of the base case scenario of 32,660 m3/h, reduced the total heat transfer area requirement from 13,256 m2 to 8,113 m2, with the condenser making the highest contribution to heat transfer area reduction. The annualized capital cost also reduced to $12,271,064.30/yr from $16,809,876.50/yr. There was 2% increase in the cycle efficiency and fuel saving of 3.8% was achieved. The economic implications of heat recovery improvement were modifications to the air ejector, gland condenser, and replacement of the drain cooler, low pressure heater and high pressure heaters. The fixed capital for plant modification was $4,694,220.96 with payback period of 1.8 years.