در مورد هم ترازی اهداف و چشم اندازهای مدل های فرایندی در مدیریت پروژه

عنوان انگلیسی
On the alignment of the purposes and views of process models in project management
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
3290 2010 17 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Journal of Operations Management, Volume 28, Issue 4, July 2010, Pages 316–332

ترجمه کلمات کلیدی
مدیریت پروژه -  مدل سازی فرایند - تناسب فناوری - وظیفه -  پشتیبانی از تصمیم گیری
کلمات کلیدی انگلیسی
پیش نمایش مقاله
پیش نمایش مقاله  در مورد هم ترازی اهداف و چشم اندازهای مدل های فرایندی در مدیریت پروژه

چکیده انگلیسی

A project manager makes decisions based on what he or she sees and understands. In large, complex projects (or programs), a manager cannot see the entire “territory” between project start and completion and therefore must rely on models or “maps” to support planning and decisions. When it comes to planning and coordinating work, project managers commonly use a variety of process model views such as flowcharts, Gantt charts, responsibility assignment matrices, and narrative descriptions. However, these views may not contain the right information to best support the purpose or decision at hand. This paper investigates the fit between model views (a kind of technology) and the managerial decisions (a kind of task) they support. Through analysis of the literature and case study data, this research identifies: (1) a set of 28 purposes for which managers draw upon process models for decision support, (2) a set of 15 views of process models, and (3) a set of 56 information attributes involved in supporting the purposes and provided by the views. The paper develops new measures of the sufficiency and extraneousness of the attributes for each purpose and view. Analysis of the evidence suggests substantial misalignment between managers’ purposes and tools. Drawing on task-technology fit theory, the paper discusses the theoretical and managerial implications of these results and contributes a new construct, purpose-view alignment, which may help explain project success in future studies. The paper also presents insights for researchers and managers on how to develop customized views that are more suitable for particular managerial tasks.

مقدمه انگلیسی

A project is “a temporary endeavor undertaken to create a unique product, service, or result” (PMI, 2008). In recent decades the number and importance of large, complex projects or programs (hereinafter, just “projects”) has continued to grow significantly (Winter et al., 2006). Projects such as the development of ships, aircraft, spacecraft, or information technologies, or the construction of skyscrapers, airports, tunnels, or subways, entail thousands of activities, done by hundreds or even thousands of people, each producing results that enable other activities to occur. Yet, such projects are notorious for cost and schedule overruns, and insufficient management of them wastes the equivalent of billions of dollars around the world each year. Because of their size, complexity, novelty, and attraction of competing interests, such projects are challenging to understand in their intricacies, let alone manage. To cope with these challenges, project managers and others commonly rely on process models to plan and coordinate project work. A process consists of all of the activities and interactions required to accomplish a project. Unlike many business and manufacturing processes, which strive to do exactly the same thing repeatedly, a project process seeks to do something new, once. Each project must plan and control its unique process (although some projects are unique in more ways than others). For large, complex projects, these managerial tasks cannot be done entirely in peoples’ heads and require the help of models. A process model is an abstraction of a process that attempts to represent its important aspects. The information captured in a process model may be organized and conveyed to users (planners, managers, workers, etc.) through different views. A view captures a subset of a model's attributes and provides a guideline for their presentation (Browning and Ramasesh, 2007). Examples of views include flowcharts, Gantt charts, various network diagrams, narrative procedures, etc.—although in current practice most models use a single view. Project managers may use one or more process model views for various purposes, such as supporting decisions about what work to do, when, and with what resources. For example, they may use flowcharts to help analyze project duration and resource allocation, Gantt charts to assign tasks and report status, and narrative procedures to direct how work is done. Managers use more than one model view because each has its strengths and weaknesses: each abstracts a different subset of process information, emphasizing certain data while omitting others. Similarly, different managerial decisions require and benefit from different bits of process information. Ideally, the model view used to support any particular purpose will incorporate the salient information. However, what if this does not happen? What if the view used by a manager does not contain the necessary and sufficient information to support a particular decision? Or, what if the essential information to support a managerial decision is buried in extraneous information? In such cases, it is possible that the efficiency and effectiveness of the managerial decision could be compromised, which might contribute to problems such as cost and schedule overruns, quality shortfalls, or even project failure. According to Bendoly and Speier (2008), it would be valuable to direct research toward the topic of “What information to include/disregard when making specific decisions” (p. 169). What a manager decides depends on what he or she perceives and understands (Bendoly and Swink, 2007), and much of this insight stems from the model views used. The proposition motivating this research is that perhaps managers do not use (or even have) model views (technologies) that are congruent with the purposes and decisions (tasks) they face. This study draws on task-technology fit theory (e.g., Goodhue and Thompson, 1995) as a basis for exploring the fit or alignment between (a) the purposes for which process models are used in project management and (b) many of the common model views. Based on literature reviews and case studies of several industrial projects, this research identified 28 purposes, 15 views, and 56 attributes of process information. Each purpose required, and each view provided, a subset of the 56 attributes. Next, the paper develops three measures of alignment. The first measures the extent to which each view provides the attributes required for each purpose (sufficiency), the second determines the extent to which each view contains superfluous attributes for each purpose (extraneousness), and the third combines these to arrive at a composite measure of purpose-view alignment (PVA). Alignment or congruence between a purpose and a view thus depends on the presence of a sufficient set of attributes and the absence of extraneous ones. Analysis of the evidence points to a significant misalignment between process model purposes and views. This paper contributes to the project management literature in several ways. First, it extends task-technology fit theory to an important context, that of project management. Second, it introduces a new construct, process model PVA, which has the potential to help explain project success, especially in large, complex projects where managers’ tacit, mental models are less likely to suffice. While existing studies have only examined whether or not a project used a particular tool (such as a view) or not, they have not controlled for a tool's appropriate use for a particular purpose. Thus, the study builds contingency theory in project management by moving beyond the question of mere tool usage to the match between tool and purpose. Third, the paper offers new measures and a technique for analyzing alignment based on both the sufficiency and extraneousness of information content. Fourth, the study provides insight into the future development of views which are better aligned with managerial purposes. The development of more appropriate and useful tools would seem to be a critical enabler of improved project management capability. The remainder of the paper is organized as follows. The next section provides the theoretical foundation, after which Section 3 describes the research methodology. Section 4 reports on the study; Section 5 discusses its limitations, implications, and insights; and Section 6 concludes.

نتیجه گیری انگلیسی

The important decisions facing managers of large, complex projects require appropriate support from model views that filter and organize the relevant information. In contemporary projects, many of the common views both miss some of this information and include extraneous information. Experienced project managers may know how and when to use certain views and when not to. However, the literature contains no systematic evaluation of the alignment between activity network model views and the purposes they support. This paper has proposed a conceptual perspective, a new construct (PVA), and an analysis technique. Based on evidence from the literature and case studies, it finds a lack of content alignment, implying a need for more supportive views. The study and its results provide important benefits for researchers and practitioners. Studying the alignment between the tools of project management and their uses provides fertile ground for building expanded theories of project performance. While performance is contingent on a great many factors, PVA is likely to influence project efficiency and effectiveness. After all, managerial decisions based on incomplete information seem more likely to be faulty, and managers inundated by extraneous data may find their decision processes slowed considerably or even misled. Getting the right tool for the job is important in any setting, but especially in the high-stakes management of large, complex projects.