دانلود مقاله ISI انگلیسی شماره 142123
ترجمه فارسی عنوان مقاله

بهینه سازی ضایعات قبل از احتراق برای نیروگاه های حرارتی با استفاده از تجزیه و تحلیل پینچ

عنوان انگلیسی
Optimization of pre-combustion capture for thermal power plants using Pinch Analysis
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
142123 2017 11 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Energy, Volume 119, 15 January 2017, Pages 950-960

ترجمه کلمات کلیدی
ضبط قبل از احتراق نیروگاههای چرخه بخار، بهینه سازی، تجزیه و تحلیل خرج کردن،
کلمات کلیدی انگلیسی
Pre-combustion capture; Steam cycle power plants; Optimization; Pinch analysis;
پیش نمایش مقاله
پیش نمایش مقاله  بهینه سازی ضایعات قبل از احتراق برای نیروگاه های حرارتی با استفاده از تجزیه و تحلیل پینچ

چکیده انگلیسی

Carbon dioxide emissions from the chimneys of thermal power plants create major environmental risks. Therefore, an important step toward reducing the emissions in these power plants can be the carbon dioxide pre-combustion capture process. In this paper, a 150 MW thermal steam cycle power plant fueled by bagasse was studied. The power plant has an efficiency of 32.74%, and emits 246.52 t/h carbon dioxide. First, the design and simulation of a suggested pre-combustion carbon dioxide capture process was outperformed. In this process, the amount of carbon dioxide separation and capture using mono ethanol amine (MEA) 30 wt% as solvent is 90%. In this condition, the mass flow of bagasse was increased about 60% to keep the plant efficiency constant. At the same time, the energy loss as a result of the addition of the carbon dioxide recovery unit was around 11%. The process was optimized through Pinch Analysis to reduce energy waste and fuel flow. Moreover, it was indicated that power plant efficiency could be increased around 8% by integrating the hot exhaust gases from the gasification unit with power plant boiler using a heat recovery steam generation (HRSG) unit. With this modification, bagasse consumption was decreased by 23%.