دانلود مقاله ISI انگلیسی شماره 52398
ترجمه فارسی عنوان مقاله

مدل های هوش مصنوعی بهینه سازی شده برای پیش بینی قیمت جایزه پروژه

عنوان انگلیسی
Optimized artificial intelligence models for predicting project award price
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
52398 2015 10 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Automation in Construction, Volume 54, June 2015, Pages 106–115

ترجمه کلمات کلیدی
هوش مصنوعی؛ بهینه سازی؛ مدیریت پروژه؛ برآورد هزینه - مقدار جایزه پیشنهادی؛ تجزیه و تحلیل رگرسیون؛ شبکه عصبی مصنوعی؛ الگوریتم ژنتیک
کلمات کلیدی انگلیسی
Artificial intelligence; Optimization; Project management; Cost estimation; Bid award amount; Regression analysis; Artificial neural network; Case-based reasoning; Genetic algorithm
پیش نمایش مقاله
پیش نمایش مقاله  مدل های هوش مصنوعی بهینه سازی شده برای پیش بینی قیمت جایزه پروژه

چکیده انگلیسی

Bridges are essential components of transportation systems. The bidding process is the main determinant of whether a contractor is commissioned to complete a construction project. Therefore, contractors must rapidly and precisely estimate construction costs and the bid award amount. This study involved optimizing artificial intelligence models to forecast bid award amounts for bridge construction projects. A genetic algorithm is used in several forecasting models, including models based on multiple regression analysis, artificial neural networks (ANNs), and case-based reasoning (CBR). Data for public bridge construction projects were collected from the Taiwan government e-procurement system. The cross-validation results show that the mathematical model for the ANNs provides more reliable simulations and has a superior fit compared with the regression methods, CBR, and the conventional approach. This study provides an optimization process for estimating project award prices that improves construction and evaluations of AI-based models as well as an auxiliary tool that contractors can use to make bidding decisions.