دانلود مقاله ISI انگلیسی شماره 82740
ترجمه فارسی عنوان مقاله

اقدامات جامع برای مدیریت بازسازی مسکن دائمی

عنوان انگلیسی
Integrated measures for managing permanent housing reconstruction
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
82740 2018 8 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Procedia Engineering, Volume 212, 2018, Pages 403-410

ترجمه کلمات کلیدی
محیط زیست ساخته شده است انعطاف پذیری فاجعه، مسکن دائمی، پس از فاجعه بازسازی، مدیریت بازسازی،
کلمات کلیدی انگلیسی
built environment; disaster resilience; permanent housing; post-disaster reconstruction; reconstruction management;
پیش نمایش مقاله
پیش نمایش مقاله  اقدامات جامع برای مدیریت بازسازی مسکن دائمی

چکیده انگلیسی

Following major disasters, stakeholders appropriate substantial resources for permanent housing reconstruction to mitigate disaster risk and to facilitate sustainable community resilience to disasters. Many stakeholders have, however, identified permanent housing reconstruction as one of the least successful humanitarian interventions as many housing interventions fail to achieve their intended outcomes. As a result, there have been calls for evidence-based studies to provide guidance for policy-makers and practitioners towards effective management of permanent housing programmes. This paper seeks to identify the issues that influence the effective management of permanent housing interventions and the measures that could be applied to manage those issues. Data were collected through semi-structured interviews with experts in post-disaster reconstruction and analyzed with the aid of NVivo 11 software. The findings served to validate and extend the issues influencing effective implementation of permanent housing interventions which had been identified in earlier research. These issues have been thematically classified into human resource issues; workmanship and quality issues; monitoring and control issues; coordination and communication issues; logistics and supplies issues; financial management issues; and health and safety issues. The study further identifies and presents the integrated measures that can be applied by policy-makers and practitioners to manage these issues and thus promote effective permanent housing reconstruction programmes.