دانلود مقاله ISI انگلیسی شماره 68852
ترجمه فارسی عنوان مقاله

یک سیستم مبتنی بر BIM برای برآورد و برنامه ریزی ضایعات تخریب و نوسازی

عنوان انگلیسی
A BIM-based system for demolition and renovation waste estimation and planning
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
68852 2013 13 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Waste Management, Volume 33, Issue 6, June 2013, Pages 1539–1551

ترجمه کلمات کلیدی
مدیریت ضایعات ساخت و تخریب ؛ برآورد ضایعات ؛ برنامه ریزی ضایعات ؛ مدل سازی اطلاعات ساختمان
کلمات کلیدی انگلیسی
Construction and demolition (C&D) waste management; Waste estimation; Waste planning; Building information modeling (BIM)
پیش نمایش مقاله
پیش نمایش مقاله  یک سیستم مبتنی بر BIM برای برآورد و برنامه ریزی ضایعات تخریب و نوسازی

چکیده انگلیسی

In the light of this research gap, this paper presents a building information modeling (BIM) based system that we have developed for estimation and planning of D&R waste. BIM allows multi-disciplinary information to be superimposed within one digital building model. Our system can extract material and volume information through the BIM model and integrate the information for detailed waste estimation and planning. Waste recycling and reuse are also considered in our system. Extracted material information can be provided to recyclers before demolition or renovation to make recycling stage more cooperative and more efficient. Pick-up truck requirements and waste disposal charging fee for different waste facilities will also be predicted through our system. The results could provide alerts to contractors ahead of time at project planning stage. This paper also presents an example scenario with a 47-floor residential building in Hong Kong to demonstrate our D&R waste estimation and planning system. As the BIM technology has been increasingly adopted in the architectural, engineering and construction industry and digital building information models will likely to be available for most buildings (including historical buildings) in the future, our system can be used in various demolition and renovation projects and be extended to facilitate project control.