دانلود مقاله ISI انگلیسی شماره 68880
ترجمه فارسی عنوان مقاله

چارچوبی برای برنامه ریزی و مدیریت سیستم خودکار و یکپارچه

عنوان انگلیسی
A framework for an automated and integrated project scheduling and management system
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
68880 2013 22 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Automation in Construction, Volume 35, November 2013, Pages 89–110

چکیده انگلیسی

Construction projects are becoming progressively larger and more complex in terms of physical size and cost. Building information modeling (BIM) is being regarded as a revolutionary change for managing the entire lifecycle of a construction project. However, the information provided by BIM cannot fulfill the requirements of on-site project scheduling and management. This paper presents a BIM-based framework with the function of developing the near-optimum schedule plan according to project objectives and project constraints for project scheduling and management. An automated database management system, a schedule simulation system, and a MD (multi-dimensional) CAD model creator provide a reliable platform for the proposed framework. To verify the concept and test the feasibility of this framework, a computer implementation called NDSM (N-Dimensional project Scheduling and Management system) was developed and implemented in a construction project.