دانلود مقاله ISI انگلیسی شماره 68229
ترجمه فارسی عنوان مقاله

ایجاد نتایج رضایت بخش در فاز اجرای پروژه های زیربنایی PPP: مجموعه ای تجزیه و تحلیل مقایسه کیفی فازی 27 پروژه ساخت و ساز جاده در هلند

عنوان انگلیسی
Producing satisfactory outcomes in the implementation phase of PPP infrastructure projects: A fuzzy set qualitative comparative analysis of 27 road constructions in the Netherlands ☆☆☆
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
68229 2015 11 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : International Journal of Project Management, Volume 33, Issue 8, November 2015, Pages 1877–1887

ترجمه کلمات کلیدی
مجموعه ای تجزیه و تحلیل فازی کیفی تطبیقی ؛ مدیریت؛ همکاری بخش خصوصی و دولتی - همکاری دولتی و خصوصی ؛ رضایت؛ پروژه زیربنایی حمل و نقل
کلمات کلیدی انگلیسی
Fuzzy set qualitative comparative analysis (fsQCA); Management; Public–private cooperation; Public–private partnership (PPP); Satisfaction; Transportation infrastructure project
پیش نمایش مقاله
پیش نمایش مقاله  ایجاد نتایج رضایت بخش در فاز اجرای پروژه های زیربنایی PPP: مجموعه ای تجزیه و تحلیل مقایسه کیفی فازی 27 پروژه ساخت و ساز جاده در هلند

چکیده انگلیسی

An understudied aspect for the successful completion of PPP infrastructure projects is the extent to which they are satisfactorily implemented. Studying PPP implementation is important though, because well-planned projects can fail if project implementation is inadequately managed. This article aims to find out which management and public–private cooperation approaches produce satisfaction for public procurers in the implementation phase of different kinds of infrastructure projects. To this purpose, twenty-seven Dutch road construction projects are systematically analyzed with fuzzy set qualitative comparative analysis (fsQCA). The results show four configurations that produce satisfaction. It is concluded that externally-oriented management, which is characterized by a stakeholder-oriented project implementation approach, and close public–private cooperation, where public and private partners work together closely and interactively, are important for achieving satisfaction. In less complex projects with narrower scopes, however, the partners may rely on less interactive forms of cooperation, more characterized by monitoring contract compliance.