دانلود مقاله ISI انگلیسی شماره 55262
ترجمه فارسی عنوان مقاله

معماری کنترل جزیره ای شدن در شبکه هوشمند آینده با کنترل تقاضا و توربین بادی

عنوان انگلیسی
Islanding Control Architecture in future smart grid with both demand and wind turbine control
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
55262 2013 11 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Electric Power Systems Research, Volume 95, February 2013, Pages 214–224

ترجمه کلمات کلیدی
معماری کنترل؛ تقاضا؛ تولید پراکنده؛ جزیره عمل؛ توربین بادی
کلمات کلیدی انگلیسی
Control architecture; Demand; Distributed generation; Island operation; Wind turbine
پیش نمایش مقاله
پیش نمایش مقاله  معماری کنترل جزیره ای شدن در شبکه هوشمند آینده با کنترل تقاضا و توربین بادی

چکیده انگلیسی

In recent years, a large number of Distributed Generation units (DG units) such as Wind Turbines (WTs) and Combined Heat and Power plants (CHPs) have been penetrating the distribution systems. Meanwhile, an intentional island operation of distribution systems is proposed as a potential measure against power supply outages by continuously running DG units during system emergencies. However, there are some challenging security issues for an island operation, such as the power imbalance during the islanding transition and the coordination of feeder protection systems. To tackle the former issue, which is the focus of this paper, available resources including both DG units and demand should be fully utilized as reserves. The control and coordination among different resources requires an integral architecture to serve the purpose. This paper develops the Islanding Control Architecture (ICA) for future smart grid, based on the Islanding Security Region (ISR) concept. With the ISR, system operators can assess beforehand if an island operation can be successful for a given distribution system at its current operating state. In case of unfavorable assessment, control measures will be suggested to coordinate different resources, aiming at pulling the system back into the ISR to ensure a successful island operation on time.