تدوین برنامه ریزی خطی برای یک مشکل تصمیم گیری مدیریت موجودی با محدودیت خدمات

عنوان انگلیسی
A linear programming formulation for an inventory management decision problem with a service constraint
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
20642 2011 6 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Expert Systems with Applications, Volume 38, Issue 7, July 2011, Pages 7929–7934

ترجمه کلمات کلیدی
مدیریت موجودی - برنامه ریزی خطی - اطلاعات ناقص
کلمات کلیدی انگلیسی
Inventory management, Linear programming, Incomplete information,
پیش نمایش مقاله
پیش نمایش مقاله  تدوین برنامه ریزی خطی برای یک مشکل تصمیم گیری مدیریت موجودی با محدودیت خدمات

چکیده انگلیسی

Inventory systems with uncertainty go hand in hand with the determination of a safety stock level. The decision on the safety stock level is based on a performance measure, for example the expected shortage per replenishment period or the probability of a stock-out per replenishment period. The performance measure assumes complete knowledge of the probability distribution during lead time, which might not be available. In case of incomplete information regarding the lead-time distribution of demand, no single figure for the safety stock can de determined in order to satisfy a performance measure. However, an optimisation model may be formulated in order to determine a safety stock level which guarantees the performance measure under the worst case of lead-time demand, of which the distribution is known in an incomplete way. It is shown that this optimisation problem can be formulated as a linear programming problem.

مقدمه انگلیسی

Some uncertainty in an inventory system (such as lead time, quantity and quality) depends on the suppliers. If the suppliers introduce too much uncertainty, corrective action should be taken. Some uncertainty, however, is attributable to customers, especially demand. If insufficient inventory is hold, a stock-out may occur leading to shortage costs. Shortage costs are usually high in relation to holding costs. Companies are willing to hold additional inventory, above their forecasted needs, to add a margin of safety. Determination of an inventory replenishment policy, of the quantities to order, of the review period are typical decisions to be taken by logistics managers. Decisions are made through optimisation models taking a performance measure into consideration which might be cost-oriented or service-oriented. Performance measures of the service-oriented type may be expressed relatively as a probability of a stock-out during a certain replenishment period, or may be expressed absolutely in terms of number of units short, which is a direct indication for lost sales. Both performance measures are taken into consideration and special attention will be paid to feasible combinations of company’s objectives regarding both performance measures. For a definition of both measures we refer to Chapter 7 in Silver, Pyke, and Peterson (1998) The expected shortage per replenishment cycle (ESPRC) is defined as (with t the amount of safety stock): equation(1) View the MathML sourceESPRC=∫t+∞(x-t)f(x)dx Turn MathJax on If ordered per quantity Q the fraction backordered is equal to ESPRC/Q and a performance measure, indicated as P2, is defined as equation(2) P2=1-ESPRC/QP2=1-ESPRC/Q Turn MathJax on The other performance measure is the probability of a stock-out in a replenishment lead time, defined as: equation(3) View the MathML source1-P1=Pr{x⩾t}=∫t+∞f(x)dx Turn MathJax on From a production or trading company’s point of view, a decision might be formulated to answer the following question: given a maximum expected number of units short and/or a maximum stock-out probability the company wants to face, what should be the safety inventory at least (or at most)? The question with the ‘at most’ option might be only of academic nature, as it reflects the most optimistic viewpoint. In human terms, this question would be interpreted as: ‘would there exist any probability distribution so that I can still reach my preset performance criteria given a specific safety inventory?’. This type of question is not relevant for a manager facing a real-life situation. In case the distribution of demand is known, determining the inventory level, given a maximum shortage or maximum stock-out probability, reduces to the calculation of the inverse cumulative probability function. The decision problem becomes more difficult if incomplete information exists on the distribution of demand during lead time, for example only the range of demand, or the first moment, or the first and second moments are known. In such a case no single value can be determined but rather an interval. In classical textbooks not too much attention is paid to the shape of the distribution of the demand during lead time. Mostly, based on the first and second moments, the safety stock level is determined using the normal distribution. When of relevance, one rather should look for a distribution, which is defined only for non-negative values and allows for some skewness. In the literature on inventory control, frequent reference is made to the Gamma distribution. It is generally known that, given a shape of the demand distribution, the higher the coefficient of variation the more a company needs inventory to reach a given service level. In an investigation on the relevance of the demand shape Bartezzaghi, Verganti, and Zotteri (1999) find out that the shape is very relevant. In extreme cases the impact of different demand shapes on inventories is comparable to the effect of doubling the coefficient of variation. An extensive overview of the distribution types used to model period demand, lead time and/or demand during lead time is given in Vernimmen, Dullaert, Willemé, and Witlox (2008). This research deals with the case where the demand distribution during lead time is not completely known. This situation is realistic either with products which have been introduced recently to the market or with slow moving products. In both cases not sufficient data are available to decide on the functional form of the demand distribution function. Some but not complete information might exist like the range of the demand, its expected value, its variance and maybe some knowledge about uni-modality of the distribution. In case incomplete information is available regarding the demand distribution the integrals of the performance measures P1 and P2 cannot be evaluated in an analytical manner. This means that also the inverse problem of determining the safety stock level to satisfy the performance measures cannot be obtained analytically. However, the integrals can be approximated by a linear programming formulation with a large set of constraints. 2. Bounds on the performance measures in the case of incomplete information In this section the ESPRC measure is focused. First, a link is identified with a similar integral formulation which appears in the field of actuarial sciences. Second, some results, which were obtained in actuarial sciences, are transferred to our type of application.

نتیجه گیری انگلیسی

It is shown how decisions regarding inventory management in the case of incomplete information on the demand distribution can be supported by making use of a linear programming formulation of the problem. At first it is illustrated using ‘the expected number short during lead-time’ as a performance measure, and the same idea is also applied in the news-vendor problem. A similar formulation can be developed making use of ‘the probability of a stock-out during lead-time’ and, of course, also the combination of both performance measures is also a challenging input to this decision-making problem.