دانلود مقاله ISI انگلیسی شماره 17279
ترجمه فارسی عنوان مقاله

روش ANP برای ارزیابی پروژه "تحقیق و توسعه" بر اساس وابستگی های متقابل بین اهداف طرح و معیارهای ارزیابی

عنوان انگلیسی
An ANP approach for R&D project evaluation based on interdependencies between research objectives and evaluation criteria
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
17279 2010 8 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Decision Support Systems, Volume 49, Issue 3, June 2010, Pages 335–342

ترجمه کلمات کلیدی
- & تحقیق و توسعه مورد حمایت دولت - ارزیابی پروژه - سود و هزینه - شاخص اولویت -
کلمات کلیدی انگلیسی
Government-sponsored R&D,Project evaluation,Benefit and cost,Preference index,
پیش نمایش مقاله
پیش نمایش مقاله  روش ANP برای ارزیابی پروژه "تحقیق و توسعه" بر اساس وابستگی های متقابل بین اهداف طرح و معیارهای ارزیابی

چکیده انگلیسی

As countries strive to become more efficient in investing limited resources in various national R&D projects, the evaluation of project has become increasingly important. However, due to the heterogeneity of the objectives of national R&D programs, few studies have been conducted on comparing programs on the basis of performance. This study explores the application of the analytic network process (ANP) approach for the evaluation of R&D projects that are elements of programs with heterogeneous objectives. The ANP produced the final priorities of projects with respect to benefits and costs when there are interdependencies between programs and evaluation criteria. The paper provides value to practitioners by providing a generic model for project evaluation. For researchers, the paper demonstrates a novel application of ANP under specific situation of heterogeneous objectives. The ANP approach is tested against empirical data drawn from R&D projects sponsored by the Korean government.

مقدمه انگلیسی

As R&D is a major force driving national competitive advantage, governments in many countries have increased the level of R&D investment by sponsoring R&D projects. Due to the scale of funding, the complexity of technology, and the heterogeneity of objectives, the evaluation of government-sponsored projects is usually viewed as a multiple criteria decision-making (MCDM) problem. A large number of methods and techniques exist in the literature for the application of multiple criteria approaches to R&D project evaluation [10]. Approaches tend to be either qualitative or quantitative, ranging from unstructured peer review, which is normally made by a review committee with experts from academia, industry, and government, to sophisticated mathematical programming, including integer programming, linear programming, nonlinear programming, goal programming, dynamic programming, and portfolio optimization. Overviews on the topic of R&D project evaluation may be found in Henriksen and Traynor [8], Martino [12], and Steele [19].

نتیجه گیری انگلیسی

This study proposed the use of the ANP approach for the evaluation of R&D projects that are elements of programs with different purposes. The case of Korean government sponsored R&D projects was presented to illustrate the proposed evaluation approach. Results of the case analysis demonstrate that the ANP produced the final priorities of projects based on benefit and cost that take into account the interdependency between programs and evaluation criteria. The paper provides value to practitioners by providing a generic model for project evaluation, and to researchers by demonstrating a new and novel application of ANP.