دانلود مقاله ISI انگلیسی شماره 28389
ترجمه فارسی عنوان مقاله

اقتصادی، زیست محیطی و تجزیه و تحلیل فنی در ایجاد سیستم های فتوولتائیک یکپارچه شده در مالزی

عنوان انگلیسی
Economical, environmental and technical analysis of building integrated photovoltaic systems in Malaysia
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
28389 2008 13 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Energy Policy, Volume 36, Issue 6, June 2008, Pages 2130–2142

ترجمه کلمات کلیدی
قابلیت سوددهى مالی از سیستم های - کاهش انتشار گازهای گلخانه ای - مسائل فنی ناشی از سیستم های
کلمات کلیدی انگلیسی
Financial viability of PV systems, Reduction in greenhouse gas emissions, Technical issues caused by PV systems
پیش نمایش مقاله
پیش نمایش مقاله  اقتصادی، زیست محیطی و تجزیه و تحلیل فنی در ایجاد سیستم های فتوولتائیک یکپارچه شده در مالزی

چکیده انگلیسی

Malaysia has identified photovoltaic systems as one of the most promising renewable sources. A great deal of efforts has been undertaken to promote the wide applications of PV systems. With the recent launch of a PV market induction programme known as SURIA 1000 in conjunction with other relevant activities undertaken under the national project of Malaysia Building Integrated Photovoltaic (MBIPV), the market of PV systems begins to be stimulated in the country. As a result, a wide range of technical, environmental and economic issues with regard to the connection of PV systems to local distribution networks becomes apparent. Numerous studies were therefore carried out in collaboration with Malaysian Energy Centre to address a number of those important issues. The findings of the studies are presented in the paper and can be served as supplementary information to parties who are directly and indirectly involved in the PV sector in Malaysia.

مقدمه انگلیسی

Greenhouse gas emissions from combustion of fossil fuels for electricity generation have grown extensively over the past two decades. Such a rapid growth of emissions has caused the world to suffer, increasingly, the adverse effects of climate changes. In the past few years, Malaysia has experienced a number of such effects. For example, the floods in Johore on Peninsular Malaysia from December 2006 to January 2007 were the worst in 100 years. These floods caused 90,000 people to leave their homes and killed 17 people. This natural event resulted in the country to suffer financial losses of about RM 6 billion (=US$1.38 billion; BBC News, 2007). The demand for electricity will continue to grow worldwide over the next two decades. In Malaysia, the energy demand is predicted to increase from 11,050 MW in 2001 to 20,087 MW in 2010 (Ninth Malaysia Plan, 2006). Therefore, the emission of greenhouse gases is predicted to increase from 43 million tones in 2005 to 110 million tones in 2020 (Mahlia, 2002). In addition, the global price of crude oil increased enormously from USD 23.17/barrel in January 2000 to USD 86.02/barrel in November 2007 (Energy Information Administration, 2007). The average increased rate of the oil price is about 34%/year. As a result, Malaysia will increasingly face a wide range of social and economic issues caused by climate changes as well as the increased prices of fossil fuels. The government has therefore put in a great deal of efforts to explore and increase the utilization of renewable energy sources in order to reduce the use of fossil fuels and so the emission of greenhouse gases (Abdul and Lee, 2005). In 2000, the government reviewed its energy policy and implemented the Five Fuel Diversification Policy, making renewable energy as the fifth source of energy in the country. It was estimated that if the use of renewable source can be increased to 5% of the total electricity generation, then the country could save RM 5 billion (US$1.32 billion) over a period of 5 years (Abdul and Lee, 2005). Since then, a wide range of programmes have been undertaken to promote and increase the installation of renewable power plants. One of the programmes is the implementation of Small Renewable Energy Power (SREP) Programme in May 2001 (Ministry of Energy, Water and Communications, 2007). Under this programme, the owners of any SREP plants can apply for a license to sell their renewable electricity to the main utility company, Tenaga National Berhad (TNB), for a period of 21 years. Up to date, 59 applicants have been approved under the SREP with total energy generation capacity of 352 MW. Many of the approved renewable power plants use biomass, wood waste and rice husk as a source of energy. Malaysia is a tropical country where solar energy is available throughout the year with solar radiation in the range of 1419 to 1622 kWh/m2/year (Solar Radiation, 2008). Under such a climatic condition, photovoltaic systems become another favourable renewable energy source. However, at present, the prices of PV modules and related components are extremely high. The current market value of PV system is about RM 28.00/Wp (US$ 8.40). The reason for such a high price is that, at present, Malaysia does not have any local PV manufacturer. All the PV modules and inverters are imported from foreign countries, such as Germany and Japan, hence causing the cost of PV systems to be very high. As a result, photovoltaic systems are not an attractive option to the public. Therefore, PV business becomes unsustainable and is often regarded by PV suppliers and service providers as their side income stream. In order to reduce the cost of PV system, Malaysia Energy Centre has carried out a project named Malaysia Building Integrated Photovoltaic (MBIPV). This project is funded by the government, United Nations Development Programme (UNDP/GEF) and various private sectors. The main idea of the MBIPV project is to incorporate PV grid-connected systems aesthetically into the building architecture and envelope. Activities undertaken in this project are aimed at creating the necessary conditions that will, in turn, lead to sustainable and widespread application of BIPV starting from 2006 onwards. The MBIPV project is expected to induce the growth of BIPV installations by 330% from the current status of 470 to about 2000 kW, with a unit cost reduction of about 20% by the year 2010. Since the commencement of the MBIPV project, a wide range of activities have been undertaken. For example, a PV market induction programme, known as SURIA 1000, was started from September 2006, although it was officially launched on 22nd June 2007. Under this programme, electricity customers can bid for price rebates on PV systems under the MBIPV project (Southeast Asia Renewable Energy Newsletter, 2007). The first round of bidding yielded 14 successful bids from 39 applicants. The successful applicants received the discount of, on average, 53% of their PV systems. This programme will operate every year until 2010. In addition, a US-based PV manufacturing company, namely First Solar, is currently setting up a manufacturing branch in Kulim Hi Tech Park located in Kedah. It is expected to complete the construction of the first phase of its factory by the end of 2007. Its first production is expected to begin by the end of 2008. First Solar will continue to expand its manufacturing plant in the future. With such increased activities associated with the PV sector, it becomes essential to address issues with regard to the connection of PV systems to local distribution networks. Therefore, collaboration was established between Tunku Abdul Rahman University and Malaysia Energy Centre to carry out studies on several critical issues. Among all these issues, the economic viability, environmental benefits and technical impacts of installing PV systems are discussed in this paper. The paper can serve as supplementary information to any parties who are directly and indirectly involved in the PV sectors. Economic viability of installing PV systems is evaluated under several considered regulatory and commercial frameworks as discussed in Section 2. Reduction in the emissions of greenhouse gases as a result of PV penetration is determined as presented in Section 3. Simulation studies are carried out to investigate the effects of PV systems on distribution network voltage level, energy losses and maximum demand charge as discussed in Section 4. Conclusions are given in Section 5.

نتیجه گیری انگلیسی

Under the current regulatory and commercial frameworks, the owners of PV systems are not able to make any financial return on their investment of the PV systems even after the government has provided a subsidy of up to 70% of the PV capital. Therefore, the current size of PV market is very small; only about 470 kW is owned by a small number of domestic customers. The potential size of PV market in the country is huge since the utility companies have domestic customers of about 6 million, while commercial and industrial customers of 1.2 million. Therefore, it may be necessary for the government and the utility companies to consider offering a higher tariff of PV electricity to the PV owners in order to promote PV installations. Numerous data presented in this paper are indications of the benefits that PV systems can bring to the government, utility companies and PV owners. For example, the government or utility company can save RM 10.26 million of natural gas and avoid a total greenhouse emission of 35,140 tonnes over the lifespan of 2 MWp PV systems. The PV owners can create additional income streams by selling CERs to developed countries in addition to the reduction of their maximum demand charges every month. The utility companies can avoid or defer the needs of upgrading their networks with minimum concern for the voltage rise issues. The values of EPBT are relevant to PV manufacturers because the values indicate that thin film is the recommended type of PV technologies for Malaysia. One of the possible challenges faced by the PV sectors is that the price of PV modules may still be high even after First Solar has been established. This is because Malaysia could face a serious shortage of silicon, which is one of the raw materials for PV cells. A large amount of silicon needs to be imported from foreign countries before an appropriate alternative material can be found locally. Another challenge is that the yearly yield (kWh) of existing PV systems is diminishing every year. One of the possible reasons could be the growth of air pollutants in the atmosphere of major cities that reduces the intensity of the solar radiation on the ground. As a result, customers’ incomes from selling PV electricity may reduce every year. The government therefore may need to put in more efforts in research and development on solar energy in order to overcome the barriers to the advancement of PV market in Malaysia.