دانلود مقاله ISI انگلیسی شماره 11902
ترجمه فارسی عنوان مقاله

برنامه ریزی نیروی کار عامل برای شمارنده ورود در فرودگاه ها

عنوان انگلیسی
Operational workforce planning for check-in counters at airports
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
11902 2010 12 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Transportation Research Part E: Logistics and Transportation Review, Volume 46, Issue 3, May 2010, Pages 414–425

ترجمه کلمات کلیدی
مدیریت عملیات فرودگاه - برنامه نویسی عدد صحیح مختلط - برنامه ریزی کارکنان - برنامه ریزی تور
کلمات کلیدی انگلیسی
Airport operations management, Mixed integer programming, Staff scheduling, Tour scheduling,
پیش نمایش مقاله
پیش نمایش مقاله  برنامه ریزی نیروی کار عامل  برای  شمارنده ورود در فرودگاه ها

چکیده انگلیسی

This paper addresses operation models for workforce planning for check-in systems at airports. We characterize different tasks of the hierarchical workforce planning problem with time-dependent demand. A binary linear programming formulation is developed for the fortnightly tour scheduling problem with flexible employee contracts. This binary programming model is solved for optimality by CPLEX for real-world demand scenarios with different workforce sizes. The numerical study analyzes the impact of the degree of flexibility and economies of scale. The model formulation is extended to generate convenient tours with regard to employee preferences.

مقدمه انگلیسی

Workforce planning involves matching the supply of and demand for employees from a strategic level up to an operational level. Strategic workforce planning suggests the determination of the workforce size over a long period of time (see Koutsopoulos and Wilson (1987)). Tactical and operational workforce planning, or rostering, is the process of constructing work timetables. According to Ernst et al. (2004b), it is common to decompose rostering problems into the following separate modules: (i) demand modeling, (ii) days-off scheduling, (iii) shift scheduling, (iv) line of work construction, (v) task assignment, and (vi) staff assignment. The first module determines how many staff are needed at different times. Days-off scheduling determines the days off for each employee. Shift scheduling is the assignment of employees to work in hours of the day (shifts). Line of work construction, or tour scheduling, combines both tasks of modules (ii) and (iii), i.e., the employees are assigned to shifts or days-off for each day of a planning horizon from one week up to several months. One or more tasks should be assigned to a shift in the task assignment module. If an individual staff has not been assigned to tours in previous modules, these assignments must be performed last. This paper addresses the analysis of workforce staffing for check-in systems, one of the subsystems of the complex passenger service system available at airports. The personnel planning of a ground handling company providing check-in services for different airlines is analyzed. In this case, contracts with airlines determine the number of check-in agents required per flight. A time-varying overall demand for check-in operators, dependent on the flight time table, can be observed. With regard to the time before departure, the workforce planning process for check-in counters is divided into four main planning tasks. On the strategic level, the head count and the required qualifications of the operators are planned for a whole flight-plan season. The rostering process is divided into three main tasks. Fortnightly tours for individual employees are constructed first, covering the modules (ii), (iii), and (iv) of the general classification above. Second, individual flights are assigned to operators for each day (task assignment). Third, due to unforeseen delays or cancellations of flights, a replanning may be necessary during the day of operation. The task assignment and the replanning tasks cover just a single day, which reduces the planning complexity in comparison to the fortnightly tour scheduling problem. For approaches to the task assignment and the replanning problem; see, for example, Fischetti et al., 1992, Dowling et al., 1997, Ernst et al., 2004a, Moz and Pato, 2007 and Abdelghany et al., 2008. The assignment and reassignment of check-in counters to flights are analyzed with respect to archiving service levels (see Tosic, 1992, Park and Ahn, 2003, Parlar and Sharafali, 2008, Duin and Van der Sluis, 2006 and Yan et al., 2008). This paper focuses on the first operational planning task of scheduling fortnightly tours. In the considered case of a ground handler at a German airport, there are very flexible restrictions for shift building and combining shifts into tours, i.e., making a valid duty roster. Such flexible employee contracts are often found in this kind of service industry. The flexible lengths and positions of the working periods make it possible to set up workforce schedules that cover the dynamic demand very closely. Labor scheduling efficiency could be improved through this scheduling flexibility, but such a change may result in a large number of variables in traditional mathematical programming formulations of shift or tour scheduling problems (see Alfares (2004)). Comprehensive literature surveys of tour scheduling problems are provided by Ernst et al., 2004a and Alfares, 2004. Typical mathematical programming formulations of the tour scheduling problem are based on the set-covering formulation of Dantzig (1954) or on implicit formulations (see Alfares (2004)). Especially for systems with a high scheduling flexibility, the number of possible tours becomes very large. As the traditional set-covering approach requires a complete tour matrix, it cannot be applied to the tour scheduling problem presented in this paper. Column generation approaches could overcome this explosion in size, but the subproblem of pricing often must be solved heuristically; see, for example, Easton and Rossin, 1991 and Ernst et al., 2004b. In implicit formulations, the rules for building shifts and tours are modeled as constraints within the mathematical program. Such formulations are analyzed for several applications; see, for example, Thompson, 1992, Thompson, 1995, Jarrah et al., 1994, Jacobs and Brusco, 1996, Aykin, 1996, Isken, 2004, Brusco and Jacobs, 2000 and Brunner et al., 2009. These formulations result in a large number of constraints and often cannot be solved for optimality for real-world tour scheduling problems; see, for example, Brunner et al. (2009). Therefore, tour scheduling problems are often decomposed into subproblems; for example, into assignments of days-off, shift scheduling, and construction of weekly tours (see Jarrah et al., 1994 and Alfares, 2004). Other heuristic solution approaches for tour scheduling problems are discussed in Morris and Showalter, 1983, Li et al., 1991, Easton and Mansour, 1993, Brusco and Jacobs, 1993 and Brusco and Jacobs, 1995. The literature regarding personnel scheduling at airport stations is limited. Schindler and Semmel (1993) analyze a shift scheduling problem for airport stations of Pan Am. Alfares (1999) analyzes a days-off scheduling problem for aircraft maintenance workers. Decomposition approaches to tour scheduling problems at airports are analyzed in Brusco et al., 1995, Dowling et al., 1997, Mason et al., 1998 and Alvarez-Valdes et al., 1999. The main contributions of this paper are the following: • the description of the hierarchical workforce planning for check-in counters with flexible employee contracts, • the development of a new binary linear programming formulation for the underlying tour scheduling problem, and • testing the new formulation for real-world demand data. To the best of our knowledge, no tour scheduling model in the literature treats all the features of flexible employee contracts and individual employee preferences. In contrast to the above-mentioned set-covering formulation and implicit models, this new formulation is based on given daily shift types. It will thus allow for the optimization of tour schedules within acceptable computation times. The remainder of the paper is organized as follows: Section 2.1 characterizes the hierarchical workforce planning process with respect to the objectives and constraints of different planning tasks. A detailed description of the analyzed tour scheduling problem with flexible contracts is provided in Section 2.2. We develop a new mathematical programming formulation for this tour scheduling problem in Section 3.1. The numerical study in Section 3.2 shows the applicability to real-world demand scenarios. The impact of the number of employees and the number of workdays on the objective function is shown in the sensitivity analysis presented in Section 3.3. In Section 4, additional restrictions on the scheduling of convenient tours based on the individual preferences of the employees are presented. Section 5 concludes with suggestions for further research.

نتیجه گیری انگلیسی

The hierarchical workforce planning process for check-in agents of a service provider at an airport has been characterized. The first operational planning task is to assign check-in agents with flexible employee contracts to valid tours for a planning horizon of 15 days. To optimize the tour schedule, a reduced set-covering formulation was developed and extended to consider individual employee preferences. The presented formulation is generic and has the potential to be applied to a wide range of tour scheduling problems. The main contribution to the research literature in this area is in how to derive a tour scheduling formulation for flexible employee contracts that can be solved for optimality within an acceptable amount of time. The numerical analysis of real-world demand cases shows that large systems operate more efficiently than do small ones. To gain those economies of scale, small check-in systems working in parallel could be merged, which may require multiple qualified operators. Further research is needed to extend the presented model to handle such multiple qualifications of the agents. Another direction of further research is the integration of robustness conditions with respect to the remaining planning tasks. Therefore, solution approaches for the task assignment and the replanning problem must be implemented. Further research could also be directed toward workforce planning for airline-specific check-in services. If an airline-specific ground handler uses a fixed agent requirement per flight, the approach proposed in this paper could also be applied. In contrast to the presented case, airlines could use service levels for passengers as restrictions instead of fixed operator requirements.