دانلود مقاله ISI انگلیسی شماره 90006
ترجمه فارسی عنوان مقاله

ارزیابی استراتژیک مقابله با سرعت بالا در کشورهای عضو اتحادیه اروپا

عنوان انگلیسی
High speed rail comparative strategic assessments in EU member states
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
90006 2017 13 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Environmental Impact Assessment Review, Volume 66, September 2017, Pages 1-13

ترجمه کلمات کلیدی
ارزیابی محیطی استراتژیک، ارزیابی پایداری، ارزیابی پایداری، راه آهن با سرعت بالا، مسائل استراتژیک، بعد استراتژیک،
کلمات کلیدی انگلیسی
Strategic environmental assessment; Sustainability Appraisal; Sustainability assessment; High speed rail; Strategic issues; Strategic dimension;
پیش نمایش مقاله
پیش نمایش مقاله  ارزیابی استراتژیک مقابله با سرعت بالا در کشورهای عضو اتحادیه اروپا

چکیده انگلیسی

This paper explores the role and capacity of strategic level assessments in addressing the strategic dimension of High Speed Rail (HSR) proposals and influencing decision-making processes. The overall research objective was to find out to what extent opportunities for strategic thinking are being undertaken in HSR. Three different cases of high speed rail were compared – High Speed Rail 2 (HS2) in the UK, High Speed Rail Network (RFAV) in Portugal and European Gauge Railway Line Kaunas in the Lithuanian-Latvian Border (Rail Baltica 2). Strategic environmental assessment (SEA) effectiveness literature was reviewed to draw on criteria that could establish a comparative framework to explain how environmental and sustainability assessments were undertaken in the three aforementioned European high speed rail case studies. Research results allow us to conclude that an SEA or a sustainability assessment/appraisal (SA) will be most beneficial if developed before any HSR project to first determine if HSR is really necessary and strategically justifiable to the achievement of both environmental and sustainability objectives. Results achieved suggest that even though the SEA and SA in the three cases studied can be said to have influenced the planning process mostly at project-level decisions, it also shows a missed opportunity to contribute to developing a high level strategy for HSR that addresses several strategic issues, assessing options before they are undertaken.