This article proposes an algorithm for deploying manpower to a statistical process control (SPC) system that monitors a multistage manufacturing system. The algorithm minimizes the expected total cost by optimizing the amount of allocated manpower in the SPC system (referred to as an M-SPC system), as well as the sample sizes, sampling intervals and control limits of the control charts. It also takes into account the probability distribution of the random process shifts at each process stage. Numerical studies show that the M-SPC system can reduce the total cost by about 75 percent, on average, compared to the traditional SPC system. It is also found that, in most of the traditional SPC systems, the allocated amount of manpower is far less than needed. This implies that the total cost can be significantly reduced with more manpower. Furthermore, the M-SPC system can be utilized and understood as easily as the traditional SPC system by shop floor operators. Some useful guidelines are provided to aid users in allocating the appropriate amount of manpower to different systems.
مقدمه انگلیسی
The design algorithms of the control charts have been developed from two perspectives in the last several decades, namely, the statistical designs (Page, 1954; Keats et al., 1995; Prabhu et al., 1997; Costa, 1999; Wu and Spedding, 2000; Magalhães et al., 2006; Liu et al., 2006) and the economic designs (Duncan, 1956; Montgomery, 1986; Lorenzen and Vance, 1986; Castillo and Montgomery, 1996; Rahim and Costa, 2000; Al-Oraini and Rahim, 2002; Ohta et al., 2002; Yang and Rahim, 2005). A statistical design minimizes the out-of-control average time to signal (ATS) (i.e. the average time required to signal a process shift after it has occurred). For example, Costa (1999) developed the View the MathML sourceX¯ and R charts with variable sample sizes and sampling intervals for speeding the detection of mean and variance shifts. However, the statistical designs do not directly measure the cost associated with the statistical process control (SPC) system. In contrast, an economic design aims to minimize the cost associated with the implementation of SPC. Duncan (1956) first proposed the economic design of the View the MathML sourceX¯ control chart. Montgomery (1980) presented a literature survey for the early works in economic chart designs. Lorenzen and Vance (1986) developed a unified approach for the economic designs of the control charts. Rahim and Costa (2000) dealt with the economic design of the joint View the MathML sourceX¯ and R charts in which the occurrence times of assignable causes follow a Weibull distribution with increasing failure rate. Ohta et al. (2002) proposed a similar economic model for the selection of parameters of time-varying charts. A main objective of implementing SPC is to minimize the total cost (Ctotal), including quality cost (Cquality) due to poor quality (Besterfield et al., 1995) and manpower cost (Cman) for implementing the SPC system. Manpower (M) is a vital factor to the total cost. If M is small, manpower cost Cman is small; but manpower shortage may result in a large out-of-control ATS and, hence, a large quality cost Cquality. Conversely, if M is large, Cman is large; but Cquality may be substantially reduced as increased manpower allows the use of large sample size and/or frequent sampling, resulting in the prompt signal of out-of-control cases. Since these two components (Cman and Cquality) of Ctotal change in opposite directions with the change of manpower M, logically, there is an optimal value of M that minimizes Ctotal. Despite the importance of manpower to the total cost, little research has been done on its deployment to an SPC system. Only recently, Wu et al. (2006) studied the deployment of manpower to a single View the MathML sourceX¯ chart. The fabrication of a product usually goes through several stages in series. In this article, it is assumed that each stage has either a single stream or a few identical streams in parallel. The integration of all the stages constitutes a manufacturing system. For example, in the manufacturing of a mechanical part, each stage usually pertains to the machining of a dimension. Some of the dimensions are critical to the overall quality of the product and, therefore, control charts are required to monitor the corresponding process stages. The literature on the design of the SPC systems that monitor multistage manufacturing systems is still limited. Woodall and Ncube (1985) investigated the multivariate CUSUM procedures and defined the out-of-control condition for a system comprising several charts. If each variable is considered as the quality characteristic in a stage, the method may be used to monitor the multistage system. Peters and Williams (1987) developed a control scheme for a three-stage manufacturing system based on a lost-cost model. Williams and Peters (1989) presented an np-control scheme integrated within a multistage production process. Hawkins (1993) discussed multivariate quality control based on regression-adjusted variables to make controls more effective than those based on variables individually. Wade and Woodall (1993) and Ding et al. (2002) published several papers studying the multistage processes and the diagnosis problems. Zantek et al. (2002) used quality linkages between the process stages to measure the effect of each stage on the output quality of subsequent stages of a multistage system and presented an economic model to aid the decision-making on the amount of investment in process quality improvement. Recently, Wu et al. (2004) and Lam et al. (2005) developed two statistical design algorithms for optimizing control limits and/or sample sizes and sampling intervals of the charts in a multistage SPC system in order to minimize the system ATS. However, these methods neither optimize the allocated manpower nor minimize the SPC cost. The manpower is fixed as a specification. This article proposes an economic M-SPC system that optimizes the amount of manpower for the operation of the multistage SPC systems. The objective is to minimize the total SPC cost in the whole system. The M-SPC system consists of multiple control charts, each monitoring a critical stage in a multistage manufacturing system. In this study, a process means the only stream in a single-stream stage or one stream in a multi-stream stage. Let s be the number of stages in series and gi be the number of parallel streams in the ith stage (gi⩾1). The total number G of processes that are monitored by the SPC system is then equal to equation(1) G=∑si=1gi. Turn MathJax on The gi parallel streams in the ith stage are assumed to have the same mean, standard deviation and target value (Runger et al., 1996), and each of the gi streams will be monitored by a separate but identical control charts (with the same sample size, sampling interval and control limits). This scenario helps to detect and diagnose the out-of-control stream (Montgomery, 2001). Consequently, there are only s different charts in the M-SPC system. The manpower M is measured by the equivalent number of full time inspectors (equipped with adequate measuring instrument) engaged with the SPC activities. It is a fraction if an operator spends only part of his time in SPC, and it is larger than one if more than one inspector is deployed to the SPC system. The M-SPC system is, therefore, useful for Quality Assurance (QA) practitioners to decide on the number of inspectors and their working time in implementing SPC. In order to focus on the objective of the M-SPC system, only the X¯¯¯ chart is studied in this article. The X¯¯¯ chart is used most widely in SPC to monitor the process mean. Traditionally, each individual X¯¯¯ chart in an SPC system is designed in isolation. The sample size n of the X¯¯¯ chart is small, often either 4, 5 or 6 (Montgomery, 2001). The sampling interval h is usually decided based on the concept of rational subgroups. However, as on-line measurement and distributed computing systems are becoming the norm in today's SPC applications (Woodall and Montgomery, 1999), the sampling interval could be much smaller than the working shift so that rational subgrouping is not enforced. The 3−σ control limits LCL and UCL are often used for the traditional X¯¯¯ charts, but they can be adjusted to satisfy different requirements on false alarm rate (or type I error).
نتیجه گیری انگلیسی
This article proposes an M-SPC system that optimizes the deployment of manpower so as to minimize the expected total cost associated with the monitoring of a multistage manufacturing system. The sample sizes, sampling intervals and control limits of the charts in the M-SPC system are also optimized. The numerical studies show that the M-SPC system is able to reduce the total cost Ctotal by nearly 75% on average, and the optimal deployment of manpower alone may reduce Ctotal by about 50%. With such significant improvement, the M-SPC system is obviously a useful and effective tool for manufacturers to achieve better quality. The value of the grand average View the MathML sourceR¯M (=34.36) of the third response shows that much more manpower should be deployed to most traditional View the MathML sourceX¯ chart systems (or general SPC systems) from the viewpoint of total cost reduction. The deployment of more manpower leads to a significant reduction in quality cost that outweighs the increase in manpower cost (or sampling cost). As a result, the total cost (Ctotal) is substantially reduced. If the manpower M0 of a traditional View the MathML sourceX¯ chart system has been increased to a level close to the optimal value M of the corresponding M-SPC system, the total cost of the traditional View the MathML sourceX¯ chart system must be nearly minimized. Most of the specifications that are used in the design of an M-SPC system are also required by the traditional system or can be obtained from the design and manufacturing information and records. The design algorithm of the M-SPC system can be easily computerized. More importantly, the use of the M-SPC system does not present any additional difficulty for operators to run and understand the SPC system. Some general guidelines have been provided for the deployment of manpower in an SPC system. Finally, it is believed that the M-SPC system can be extended and then applied to the designs of M-SPC systems that employ other types of control charts (e.g. the CUSUM and EWMA charts) or that use the joint charts to monitor simultaneous mean and variance shifts (e.g. the View the MathML sourceX¯&R charts).