دانلود مقاله ISI انگلیسی شماره 43088
ترجمه فارسی عنوان مقاله

برنامه ریزی یکپارچه سیستم های تولید انعطاف پذیر با منابع محدود با استفاده از برنامه نویسی محدودیت

عنوان انگلیسی
Integrated scheduling of resource-constrained flexible manufacturing systems using constraint programming
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
43088 2014 14 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Expert Systems with Applications, Volume 41, Issue 5, April 2014, Pages 2286–2299

ترجمه کلمات کلیدی
سیستم های تولید انعطاف پذیر - منابع محدود برنامه ریزی - محدودیت برنامه نویسی - کارگاه خودکار
کلمات کلیدی انگلیسی
Flexible manufacturing systems; Resource-constrained scheduling; Constraint-programming; Automated job-shop
پیش نمایش مقاله
پیش نمایش مقاله  برنامه ریزی یکپارچه سیستم های تولید انعطاف پذیر با منابع محدود با استفاده از برنامه نویسی محدودیت

چکیده انگلیسی

This contribution presents a novel approach to address the scheduling of resource-constrained flexible manufacturing systems (FMSs). It deals with several critical features that are present in many FMS environments in an integrated way. The proposal consists in a constraint programming (CP) formulation that simultaneously takes into account the following sub-problems: (i) machine loading, (ii) manufacturing activities scheduling, (iii) part routing, (iv) machine buffer scheduling, (v) tool planning and allocation, and (vi) AGV scheduling, considering both the loaded and the empty movements of the device. Before introducing the model, this work points out the problems that might appear when all these issues are not concurrently taken into account. Then, the FMS scheduling model is presented and later assessed through several case-studies. The proposed CP approach has been tested by resorting to problems that consider dissimilar number of parts, operations per part, and tool copies, as well as different AGV speeds. The various examples demonstrate the importance of having an integrated formulation and show the important errors that can occur when critical issues such as AGV empty movements are neglected.