دانلود مقاله ISI انگلیسی شماره 92351
ترجمه فارسی عنوان مقاله

چالش های بازسازی و بهبود های احتمالی

عنوان انگلیسی
Remanufacturing challenges and possible lean improvements
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
92351 2018 12 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Journal of Cleaner Production, Volume 172, 20 January 2018, Pages 3225-3236

ترجمه کلمات کلیدی
بازسازی، اقتصاد مدرن، تولید ناب، زمان بین شروع و اتمام فرآیند تولید،
کلمات کلیدی انگلیسی
Remanufacturing; Circular economy; Lean production; Lead time;
پیش نمایش مقاله
پیش نمایش مقاله  چالش های بازسازی و بهبود های احتمالی

چکیده انگلیسی

Remanufacturing is a viable way to prolong the useful life of an end-of-use product or its parts. Despite its economic, environmental, and social benefits, remanufacturing is associated with many challenges related to core (used product or its part) availability, timing and quality. The aim of this paper is to study how lean production could be used to tackle remanufacturing process challenges and contribute to shorter lead times. To meet this aim, we conducted a literature review and case studies of four remanufacturing companies. The case companies’ remanufacturing challenges were: (1) a lack of material requirements planning system, (2) poor core information, (3) a lack of core material, (4) poor spare parts information, (5) a lack of spare parts material, (6) insufficient quality management practices, (7) large inventories, (8) stochastic remanufacturing processes, (9) a lack of supply-demand balance, and (10) insufficient automation. These challenges contribute to long and variable remanufacturing process lead times. To tackle remanufacturing challenges, seven lean-based improvements with a major effect on improvements in lead time were suggested: standard operations, continuous flow, Kanban, teamwork, employee cross-training, layout for continuous flow, and supplier partnership. Providing that the suggested improvements are implemented, a possible lead time reduction of 83–99 per cent was projected.