مدل برنامه ریزی آرمانی برای برنامه ریزی تولید محصولات فاسد شدنی با تعویق

عنوان انگلیسی
A goal programming model for production planning of perishable products with postponement
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
26808 2007 11 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Computers & Industrial Engineering, Volume 53, Issue 3, October 2007, Pages 531–541

ترجمه کلمات کلیدی
مدیریت تولید - برنامه ریزی هدف - فرآورده های فاسد شدنی - تعویق -
کلمات کلیدی انگلیسی
Production management, Goal programming, Perishable products, Postponement,
پیش نمایش مقاله
پیش نمایش مقاله  مدل برنامه ریزی آرمانی برای برنامه ریزی تولید محصولات فاسد شدنی با تعویق

چکیده انگلیسی

One of the important characteristics of perishable products that a decision-maker has to take into account seriously is that the price will drop significantly after a day, or a season. Hence, over-production and storage of such products is not recommended. In this paper, the production process for perishable products is proposed to be divided into two phases by applying the concept of postponement. Consequently, three production activities – direct production, master production and final assembly – will be considered. A preemptive goal programming model to solve aggregate production planning for perishable products is developed, in which three objectives are optimized hierarchically. A set of Hong Kong data has been used to test the effectiveness and the efficiency of the proposed model. Results demonstrate that the decision-makers can find the flexibility and robustness of the proposed model by adjusting the goal priorities with respect to the importance of each objective and the aspiration level with respect to desired target values.

مقدمه انگلیسی

Postponement of production refers to a common intermediate product being manufactured in the first phase and, according to the differentiating options (such as colors, sizes and types), production line activities such as dyeing, compounding, final assembling, packaging and so on being postponed to a second phase – i.e. until customer orders are received (Aviv and Federgruen, 2001a, Aviv and Federgruen, 2001b and Van Hoek, 2001). Lee and Billington (1994) redesigned a European DeskJet Printer line of Hewlett Packard using the postponement strategy. Pagh and Cooper (1998) stated that the advantage of postponement is reduction or full elimination of risk and uncertainty in manufacturing and logistics operations. Garg and Tang (1997) investigated two points of postponement in the manufacturing stage – early postponement and late postponement – and investigated the importance of demand variabilities and correlations between, and relative magnitudes, of lead times in determining the appropriate points of differentiation. Aviv and Federgruen (2001b) studied the benefit of postponement with unknown demand distributions. Recently, Van Hoek (2001) reviewed the literature on postponement and identified postponement opportunities in operations. In this paper, a postponement strategy is employed to solve production planning for perishable products in a situation with limited resources in production and dramatic growth in demand. Demand for perishable products is time-sensitive because the demand dramatically increases as the day approaches the end of life-cycle, such as the Christmas Day. On the other hand, a shortage of perishable products while the product is saleable may result in significant loss of revenue because perishable products cannot be profitable after a certain day. For instance, in manufacturing industries, people want to buy a Christmas gift in or before December only. Controlling the inventory of perishable products is crucial. However, there is little research that addresses aggregate production planning for perishable products. Traditionally, the objective of aggregate production planning is either to maximize profit or minimize cost and is formulated to a single-objective function in linear programming. Recently, many researchers and practitioners are increasingly aware of presence of multiple objectives in real-life problems (Vincke, 1992). Baykasoglu (2001) noted that the aggregate production planning may consider minimization of costs, inventory levels, changes in work force levels, overtime wages in production, subcontracting, changes in production rates, number of machine set-ups, plant/personnel idle time and maximization of profits and superior customer service. Decision-makers always want to develop a model that can consider real-life situations with multiple objectives. To achieve this, in this paper, a preemptive goal programming model is formulated to determine optimal production loading plans. As opposed to linear programming, which directly optimizes objectives, preemptive goal programming is used to manage a set of conflicting objectives by minimizing deviations between the target values and the realized results (Rifai, 1994). The original objectives are re-formulated as a set of constraints with target values and two auxiliary variables. Two auxiliary variables are called positive deviation d+ and negative deviation d−, which represent the distance from this target value. The objective of preemptive goal programming is to minimize the deviations hierarchically so that the goals of primary importance receive first-priority attention, those of secondary importance receive second-priority attention, and so on and so forth. Then, the goals of first-priority are minimized in the first phase. Using the obtained feasible solution result in the phase, the goals of second priority are minimized, and so on. With fast computational growth, both linear and non-linear GP can be solved using well-developed software such as Linear Interactive and Discrete Optimization (LINDO) or meta-heuristics such as simulated annealling, genetic algorithms, tabu search and so on ( Jones, Mirrazavi, & Tamiz, 2002). An explicit definition of goal programming was given by Charnes and Cooper (1961). The purpose of this study is to develop a preemptive goal programming model to optimize the production planning problem for perishable products under an uncertain environment, from which we can determine (1) how many finished products should be produced from raw materials directly (direct production), (2) how many semi-finished products should be produced from raw materials (master production), and (3) how many finished products should be produced from semi-finished products (final assembly) so that resources can be better utilized to meet any dramatic growth in demand and total costs (consisting of setup costs, production costs, labor costs, inventory costs, hiring costs and lay-off costs) can be minimized. The organization of this paper is as follows. After this introduction, characteristics and issues of current operations in the toy company under investigation are reviewed. Then a preemptive goal programming model is formulated to solve the production planning problem for perishable products using a postponement strategy in Section 3, and a set of data from the toy company is used to test the effectiveness and efficiency of the proposed model in Section 4. Our conclusions are given in the final section.

نتیجه گیری انگلیسی

In this paper, a preemptive goal programming model is proposed to deal with the aggregate production planning problem in a toy company in Hong Kong. Due to demand characteristics, the product studied is regarded as a perishable product which cannot be sold or the demand for which drops significantly after Christmas. Three major objectives with target values are optimized hierarchically. The three objectives are the minimization of operating cost consisting of setup cost, production cost and labour cost, the minimization of inventory cost consisting of carrying cost and backorder cost, and the minimization of hiring and layoff cost to reduce the change of workforce level. The model can effectively find an optimal production loading plan consisting of three production activities which are direct production, master production and final assembly. It is also able better to control inventory levels with surplus storage and shortage. A real case in an existing Hong Kong-based plush toy manufacturing company is studied in this paper. Some useful findings are observed. With postponement strategy, it is recommended to produce semi-finished products in the earlier planning horizon, to be used to perform final assembly in the later period of planning horizon in order to meet the dramatically increases in demand. The results of the runs illustrate the flexibility and robustness of the model so that the management can examine numerous scenarios regarding various strategic assumptions by changing priority rankings. This paper illustrates the effectiveness and the efficiency of the proposed model. However, there is still much room for improvement and investigation for the proposed model with regard to its application to real-world situations. Real data from other manufacturing companies can be used to validate the model and to analyze its sensitivity to changes in production management strategies. It should be noted that the computation and analysis of the model under different scenarios would lead to different outcomes.