دانلود مقاله ISI انگلیسی شماره 105642
ترجمه فارسی عنوان مقاله

اکتشافات برای یک مسئله برنامه ریزی جریان و کار با هدف گام به گام شغلی

عنوان انگلیسی
Heuristics for a flowshop scheduling problem with stepwise job objective function
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
105642 2018 13 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : European Journal of Operational Research, Volume 266, Issue 3, 1 May 2018, Pages 950-962

ترجمه کلمات کلیدی
برنامه ریزی فلوشیپ، اهریمنی، متهوریستی،
کلمات کلیدی انگلیسی
Flowshop scheduling; Heuristics; Metaheuristics;
پیش نمایش مقاله
پیش نمایش مقاله  اکتشافات برای یک مسئله برنامه ریزی جریان و کار با هدف گام به گام شغلی

چکیده انگلیسی

In this work, we introduce the Flowshop Scheduling Problem with Delivery Dates and Cumulative Payoffs. This problem is a variation of the flowshop scheduling problem with job release dates that maximizes the total payoff with a stepwise job objective function. This paper contributes towards proposing a mathematical formulation for this new problem and an original constructive heuristic. Additionally, we develop a new benchmark of 300 hard instances which are available in a public repository. Besides, we provide primal and dual bounds for them. Extensive computational experiments were carried out taking into account classical constructive heuristics and hybrid local searches. Results show the merit of the FF heuristic when compared to other classical heuristics for flowshop scheduling problems. Additionally, we compare an Iterated Local Search (ILS), an Iterated Greedy Search (IGS), and a Biased Random-Key Genetic Algorithm (BRKGA), both customized for the studied problem, and a commercial mixed integer programming solver. The comparison between these methods showed that the BRKGA starting with a solution from FF heuristic is able to find the best solutions in a very short period of time. Iterated local Search and the commercial solver presented significantly worse results than the aforementioned methods.