تاثیر اطلاعات حساسیت بر پیش بینی زمان انجام پروژه با استفاده از روش برنامه کسب شده

عنوان انگلیسی
Impact of sensitivity information on the prediction of project's duration using earned schedule method
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
42332 2013 10 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : International Journal of Project Management, Volume 31, Issue 4, May 2013, Pages 579–588

ترجمه کلمات کلیدی
مدیریت ارزش کسب شده - پیش بینی مدت زمان اجرای پروژه - برنامه کسب - فعالیت های حیاتی - اقدامات حساسیت زمان
کلمات کلیدی انگلیسی
Earned value management; Project duration forecasting; Earned schedule; Critical activities; Time sensitivity measures
پیش نمایش مقاله
پیش نمایش مقاله  تاثیر اطلاعات حساسیت بر پیش بینی زمان انجام پروژه با استفاده از روش برنامه کسب شده

چکیده انگلیسی

Recently, the prediction of project duration has been investigated in earned value management (EVM) using three earned value methods, planed value (PVM), earned duration (EDM) and earned schedule (ESM). The investigation has shown that ESM method outperforms on average the other two methods and fails in case of wrong warning coming from non-critical activities which suffer from delays and/or ahead of schedule. The objective of this paper is twofold: first, we study the impact of the activities' sensitivity information on the forecasting accuracy of the ESM method. Second, we test the claim that in normal conditions the project performance indicator provided by ESM at higher work breakdown structure is reliable. More precisely, activity based sensitivity measures are used as weighing parameters of the activities to improve the schedule performance of a project by removing or decreasing the negative effect of wrong warning of the non-critical activities. The computational results of a simulation study on a big benchmark projects reveal that the sensitivity information are capable of improving the forecasting accuracy of the ESM method.