دانلود مقاله ISI انگلیسی شماره 104361
ترجمه فارسی عنوان مقاله

مدل سازی سیستم فتوولتائیک توزیع شده با و بدون ذخیره سازی باتری: مطالعه موردی در بلم، شمال برزیل

عنوان انگلیسی
Modelling distributed photovoltaic system with and without battery storage: A case study in Belem, northern Brazil
کد مقاله سال انتشار تعداد صفحات مقاله انگلیسی
104361 2018 9 صفحه PDF
منبع

Publisher : Elsevier - Science Direct (الزویر - ساینس دایرکت)

Journal : Journal of Energy Storage, Volume 17, June 2018, Pages 11-19

ترجمه کلمات کلیدی
شبیه سازی، انرژی خورشیدی، شمال برزیل، توان خروجی، تحلیل اقتصادی،
کلمات کلیدی انگلیسی
Simulation; Solar energy; Northern Brazil; Power output; Economic analysis;
پیش نمایش مقاله
پیش نمایش مقاله  مدل سازی سیستم فتوولتائیک توزیع شده با و بدون ذخیره سازی باتری: مطالعه موردی در بلم، شمال برزیل

چکیده انگلیسی

This paper focuses on simulating photovoltaic PV electricity output and the economics analysis of distributed grid-connected systems with and without battery in the city of Belem, northern Brazil. The work used the System Advisor Model to perform all simulations including the financial evaluation which was calculated using the levelised cost of electricity (LCOE), payback period, and net present value (NPV). The electricity output performance was very similar between both systems, though the system without battery storage achieved better results in all technological parameters. Concerning the net metering system, the system without energy storage returned 144.70 kWh to the grid during the first year whereas system with energy storage returned only 6.6 kWh to the grid. The economic analysis demonstrated that the feasibility of the project is influenced by the discount rate and inflation adopted, but mostly by the discount rate. The results point out better real LCOE and net present value on the system without storage. Although real LCOE estimated for the system with storage resulted in higher values than electricity tariff from the concessionaire and negative NPV, the payback and cash flow analysis reveals that the investment on any project is paid in less than 17 years.